ACMI-Silicon

xiaofengxiao@acmi.org.cn
Your Position: HOME PROJECT
Zhejiang Kangshuo to Build New Silicone Material Products Project (June 10, 2024-June 16, 2024)

Zhejiang Kangshuo to Build New Silicone Material Products Project (June 10, 2024-June 16, 2024)

Editor:ACMI-Silicon Jun-17-2024

The 100kt/a lithium-based battery electrolyte and 14kt/a new silicone material products are planned by Zhejiang Kangshuo New Material Co., Ltd, whose environmental impact assessment report was publicized on June 13. The RMB 530 million project is situated at the High-Tech Zone, Quzhou, Zhejiang province. Once the project is completed, the firm will have capacity of 100kt/a lithium battery electrolyte, and 14kt/a hexamethyldisilazane derivative products, including 1,000t/a electronic-grade hexamethyldisilazane, 2,000t/a hexamethyldisilazane lithium salt, 3,000t/a hexamethyldisilazane, 5,000t/a hexamethyldisiloxane, and 3,000t/a special silicone resin, and byproducts of 7,634 tons of hydrochloric acid, 2,244 tons of ammonium chloride, and 1,265 tons of ethanol.