ACMI-Silicon

xiaofengxiao@acmi.org.cn
Your Position: HOME PROJECT
Jiujiang Changdong to Build Silicone Products Project (June 3, 2024-June 9, 2024)

Jiujiang Changdong to Build Silicone Products Project (June 3, 2024-June 9, 2024)

Editor:ACMI-Silicon Jun-11-2024

Jiujiang Changdong New Energy Co., Ltd. plans to build the 89.7 kt/a silicone products (including hydrogenated silicone fluid etc.) project, of which the environmental impact assessment report was publicized. This RMB 268 million project sits at Xinghuo Industrial Park, Yongxiu County, Jiujiang City, Jiangxi Province. As soon as the project is completed, the firm will have capability of annually manufacturing 3,500 tons of ethylene trimethoxysilane, 1,000 tons of vinyl cyclic compounds, 4,000 tons of methyl vinyl dichlorosilane, 4,500 tons of ethyl orthosilicate, 6,000 tons of hydrogenated silicone fluid, 5,500 tons of trichlorosilane, 200 tons of 4,6-dichloropyrimidine, 6,000 tons of ethylene trichlorosilane, 6,000 tons of silicon tetrachloride, and 500 tons of silicon dichlorosilane. Meanwhile, it will obtain 50 kt of hydrochloric acid and 2,500 tons of dilute hydrochloric acid per year as the byproducts.