HOSHINE for 400 kt/a siloxane Lines & Downstream Deep Processing (June 5, 2023-June 11, 2023)

HOSHINE for 400 kt/a siloxane Lines & Downstream Deep Processing (June 5, 2023-June 11, 2023)

Editor:ACMI-Silicon Jul-18-2023

Xinjiang Hoshine Silicon New Material Co., Ltd. plans to start construction on the 400 kt/a siloxane and the downstream deep processing projects, of which the EIA report was publicized on June 6th. The RMB 1.0425 million project is located at the north of Shanshan Stones Industrial Park, Turpan City, Xinjiang. The full project comprises three systems, i.e. methanol based pyrolysis gas, siloxane production and its downstream deep processing, and hydrochloric acid production via ionic membrane caustic soda. The siloxane section is planned to build the 400 kt/a siloxane project that consists of four lines, each having capacity of 100 kt/a, and downstream products units (including 13.88kt/a of hydrogen containing silicone fluid, 200 kt/a of OH polymer, 64 kt/a of mixed gas phase rubber, 221.714 kt/a of silica gel precipitated and 5.816 kt/a of high boiling silicone fluid).